Key feature of the building required by client was industrial appearance, avoid additional plaster finish on walls wherever possible, including exposing stiffeners when unplastered. In order to aesthetically blend in stiffeners with wall material colour which was grey using concrete blockwalls, StiFlex was treated with hot-dip galvanizing. This additional treatment was ideal for corrosion protection since walls and stiffeners were to remain unplastered.

Architect Ascendas
Structural Consultant SCE Consultants
Builder Poh Lian Construction
   
Wall parameters with StiFlex modular solution Values
Wall types Concrete block wall
Height Various: 4m to 6m
Special feature Walls and stiffeners to remain un-plastered in some areas

Advantages

  • Easy ordering
  • Rapid installation
  • Adjustable lengths & positions
  • Masonry adaptability

Contact Form

Would you like to get more information about Dyntek products? We look forward to let you know.

Fieldset
Fieldset